Question: 2. A failure to complete the work, a failure to pay for the work completed from the employer side, delays in work or in payment

2. A failure to complete the work, a failure to
2. A failure to complete the work, a failure to
2. A failure to complete the work, a failure to
2. A failure to complete the work, a failure to
2. A failure to complete the work, a failure to pay for the work completed from the employer side, delays in work or in payment schedules, unauthorized subcontracting, failure to arrange bonding or insurance provisions required under the contract and deviations from the specifications. This can be called (1 Point) O Disputes and claim in construction Damages clause. Breach of contract O Liquidated damages 4. Usually the crashing of any project must be started with (1 Point) the activity which should be crashed is the non-critical activity which will add the least amount to the overall project cost the activity which should be crashed is the one on the critical path which will add the least amount to the overall project cost. the activity which should be crashed is the one which is the critical or non critical and which will add the least amount to the overall project cost. the activity which should be crashed is on matter where it located as far as it will give the least crashing cost. 5. If the Es of an activity 6 and LF 13 and the duration of the activity is 7 days the total float of this activity is: (1 Point) 0 11 19 20 6. Dick in the correct statement from the following 5. If the Es of an activity 6 and LF 13 and the duration of the activity is 7 days the total float of this activity is: (1 Point) 11 19 20 6. Pick in the correct statement from the following

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!