Question: 2 . A flexible manufacturing system is being planned. It has a ladder layout as pictured in Figure 1 and uses a rail guided vehicle

2. A flexible manufacturing system is being planned. It has a ladder layout as pictured in Figure 1 and uses a rail guided vehicle system to move parts between stations in the layout. All work parts are loaded into the system at station 1, moved to clockwise direction one of three processing stations (2,3, or 4), and then brought back to station 1 for unloading. Once loaded onto its RGV, each work part stays onboard the vehicle throughout its time in the FMS. Load and unload times at station 1 are each 1.0 min. Processing times per delivery at other stations are: 5.0 min at station 2,7.0 min at station 3, and 9.0 min at station 4. Hourly production of parts through the system is: 7 parts delivery through station 2,6 parts delivery through station 3, and 5 parts delivery through station 4.

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!