Question: 2. All this information can be presented by network shown below. START 0 B 4 10 Activity Code A. Excavate B. Foundation C. Rough

2. All this information can be presented by network shown below. START 0 B 4 10 Activity Code A. Excavate B. Foundation C. Rough wall D. Roof E. Exterior plumbing F. Interior plumbing G. Exterior siding H. Exterior painting I. Electrical work J. Wallboard K. Flooring L. Interior painting M. Exterior fixtures N. Interior fixtures FINISH O 8 Find the critical path for each activity network. Find ES, EF, LS and LF
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts