Question: 2. An industrial engineer wants to implement dynamic task sharing in an assembly cell to meet increasing demand. The cell currently uses a traditional assembly

2. An industrial engineer wants to implement

2. An industrial engineer wants to implement dynamic task sharing in an assembly cell to meet increasing demand. The cell currently uses a traditional assembly line balance. In the existing system tasks a, b, and c are done by worker 1 and tasks d and e are done by worker 2. Tasks times are shown in the table below. Suggest a scheme for using task sharing to increase throughput and indicate the expected change in throughput time and production rate. Task Task Time a 10 b 8 8 d 10 e 10