Question: 2 . Assignment Welcome to the Construction Project Management case study, a dynamic experience designed to bridge the gap between theory and practice in managing

2. Assignment
Welcome to the Construction Project Management case study, a dynamic experience designed to bridge
the gap between theory and practice in managing projects. This assignment equips you with a holistic
understanding of the multifaceted challenges faced by project managers within the construction industry.
You are the newly appointed project management team for "Green Horizons Construction," a renowned
firm specialising in sustainable civil engineering projects. Your mission is to manage the development of a
ground breaking sustainable community centre. This project is high-profile and it is expected to set a new
standard for eco-friendly construction.
The community centre will serve as a hub for education, recreation, and community engagement. It must
achieve Net Zero Energy status and adhere to the highest sustainability standards.
You need to choose your group mates (maximum 5 students per each group) before Week 2.
Each group will be given a scenario with specified budget, timeline, construction quote and cash flow.
I need help with task 2: Task 2: Project Planning:
Comprehensive Planning:
Include a detailed project management plan that assigns roles and responsibilities to team
members (include a chart of your organisation) and outlines communication protocols.
Integrate sustainability principles into the project plan, specifying green building certifications
(e.g., LEED Platinum) to pursue or energy-saving strategies like passive solar design.
Procurement Strategy:
Specify the selected procurement method, e.g., design-build, and allocate 37,000 for
procurement-related expenses.
Detail how local suppliers and contractors will be engaged to reduce transportation-related
carbon emissions and ensure timely material deliveries.
Financial Analysis:
Conduct a cost-benefit analysis comparing sustainable construction choices (e.g., solar panels,
rainwater harvesting) with traditional alternatives, with a focus on long-term savings.
Perform a financial analysis based on the provided cash flow projection for the project over 20
years:
o Using the provided cash flow data and a discount rate of 10%, calculate the Net Present
Value (NPV) and Internal Rate of Return (IRR) of the project.
o Interpret the results of the NPV and IRR calculations. Is the project financially viable?
Explain your reasoning. Scenario 3(Timber Structure):
The Eco-Friendly Community Centre in Chiswick, London is more than just a structure; it exemplifies the Construction Quote:
Description
Total Cost (\(\mathbf{(1)}\)
Site Preparation
Site Clearing and Demolition
Excavation and Grading
Soil Testing and Remediation
Foundation and Structure
Foundation Construction
Timber Structure
Roof Trusses and Beams
Utilities and Services
Plumbing and Sanitary Systems
Electrical Systems
HVAC Systems
Interior Finishes
Flooring and Wall Finishes
Ceiling Systems
Interior Fixtures and Furnishings
Exterior
Roofing and Waterproofing
Exterior Wall Finishes
Landscaping and Exterior Amenities
Landscaping and Green Areas
Parking Lot and Paving
Contingency (10\%)
Total Estimated Project Cost Cash Flow (after completion): Location:
2 . Assignment Welcome to the Construction

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!