Question: 2 . Assume you are managing a manufacturing line consisting of two workstations: Decambering and Hemming. The mean effective process time of the first machine

2. Assume you are managing a manufacturing line consisting of two workstations: Decambering and Hemming. The mean effective process time of the first machine is 45 minutes and its coefficient of variation is 1(i.e., exponential distribution). The second machine has the same coefficient of variation, but this machine takes 42 minutes to process a part.
(a) Ifthereisaninfinitebufferbetweenthemachines,computetheexpectedWIP,CT,andTH.
WIP: _________ TH: _________ CT: _________