Question: 2. Consider the following master production schedule (MPS), product structure diagram, and inventory data: Master Production Schedule (Start): 1 3 Product A B 7 Week

2. Consider the following master production

2. Consider the following master production

2. Consider the following master production

2. Consider the following master production schedule (MPS), product structure diagram, and inventory data: Master Production Schedule (Start): 1 3 Product A B 7 Week 4 5 95 2 125 6 150 70 8 130 80 Product Structure Diagram: B D(2) E(2) C(2) E(2 D/1 E(1) D(1 E(1) E(1 Inventory Data: Item Data Category D Lot-size rule L4L POQ (P=3) Lead time 3 weeks 2 weeks Scheduled receipts 200 (week 2) None On-hand inventory 85 625 (a) Determine the low-level codes for item C, D, and E. E FOQ - 800 1 week 800 (week 1) 350 (1 marks) (b) Construct the Material Requirements Plan (MRP) for the next 8 weeks for item D, E and F by using the MRP tables provided. (3 marks) Lot Size: Lead Time: 5 6 1 2 3 4 7 8 Item: Description: Week Gross requirements Scheduled receipts Projected on hand Planned receipts Planned order releases Lot Size: Lead Time: 5 6 1 2 3 4 7 8 Item: D Description: Week Gross requirements Scheduled receipts Projected on hand Planned receipts Planned order releases Lot Size: Lead Time: 5 1 2 3 4 7 8 Item: E Description: Week Gross requirements Scheduled receipts Projected on hand Planned receipts Planned order releases C) Summarize the results from Material Requirements Plan (MRP) in a planned order report. (1 marks) Planned order report: Week Item 1 2 3 4 8 D E 6

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!