Question: 2 ) Consider the two - step process. Step A has a processing time of 2 minutes per unit and a setup time of 1
Consider the twostep process. Step A has a processing time of minutes per unit and a
setup time of minutes. Step B has a processing time of minutes per unit, but no setup
time is required. There is a buffer between steps A and B if there is a minor delay in operation.
points
a Draw the flow chart for this problem.
b Suppose units are produced in batches of Which step is a bottleneck, and what is the
capacity of the process in units per minute
c What is the batch size that maximizes the flow rate of this process with minimal inventory?
Assume there is significant demand.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
