Question: 2. Enter the information from previous task into MS Project. View the network diagram and critical task report to see the critical path. Generate the

2. Enter the information from previous task into MS Project. View the network diagram and critical task report to see the critical path. Generate the network diagram view and critical task report.
TASKS 1. Considered the following table. All estimated duration times are in days, and the network proceeds from Node 1 to Node 7: Activity Initial Node Final Node 2 3 4 A BCDEFGHI J 1 1 1 Estimated Duration 2 2 3 4 2234556 5356677 53632 2 a) Draw an AOA network diagram representing the project. Put the node numbers in circles and draw arrows from node to node, labeling each arrow with the activity letter and estimated time. b) Identify ALL of the paths on the network diagram and note how long they are. (Use Figure 6.8 in textbook as a guide for how to represent each path). c) What is the critical path for this project and how long is it? d) What is the shortest possible time needed to complete this projectStep by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts