Question: 2 . ) Given the power system shown below, with reactance in positive values. Utility and transformer modeling have the same sequence modeling, ? x
Given the power system shown below, with reactance in positive values. Utility and transformer modeling have the same sequence modeling, otherwise stated. The autotransformer windings are assumed to have reactance values. Determine the following using an MVAb and the utility is connected as wye ground.
a The sequence networks of the power system pts
b If the fault point occurs at the LOAD, determine Zth Zth and Zth pts
c The fault current and dead short circuit MVA if the fault point occurs at the UTILITY side pts
T specs:
H: MVA
X: MVA
Y: MVA
ohr
ohr
ohms
ohn
Bus
M
MVA
of XI
value of
less than
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock