Question: 2. Using the project information below and least cost method, reduce the schedule until you reach the crash point of the network. For each move,

2. Using the project information below and least
2. Using the project information below and least cost method, reduce the schedule until you reach the crash point of the network. For each move, identify the activities crashed and the adjusted total cost. Initial project duration is 13 and total direct cost is $1,000. (10 points) Activity Duration Predecessor None C and E Activity Slope Maximum crash 100 DAHL Normal time Normal cost 150 100 200 200 200 150 501