Question: 22) A manufacturing process decision affects A) the type of workforce needed B) the type of equipment needed C) the type of products that can
22) A manufacturing process decision affects A) the type of workforce needed B) the type of equipment needed C) the type of products that can be made D) All of the above are correct 23) The time between completions of successive units on a production line is called: A) cycle time. B) takt time. C) elapsed time. D) work time. (24) An advantage of a production line process is: A) the volume of output needed to justify the investment. B) the per unit cost of items produced on the line. e) the degree of flexibility of the process. D) the range of output typically produced on such a process. 25) The manufacturing process used to make a wide variety of highly customized products in quantities as small as one is a: A) production line. B) continuous flow process. C) job shop D) fixed position. 26) A sporting apparel manufacturer that produces t-shirts to commemorate significant athletic achievements for proud students and alumni probably uses: a fixed position layout. a production line. a continuous flow process. batch manufacturing. The Devon Tower graces the Oklahoma City skyline and is officially the tallest building in the . The manufacturing process used to produce this jewel is most probably: batch manufacturing process. fixed-position layout. aybrid process. ob shop
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
