Question: 23128 FSI A (3) C (5) 5 FF3 E (4) FF 3 SS1 FS3 SS3 B (4) SS3 F (5) D (3) 11.16 11,3 13

23128 FSI A (3) C (5) 5 FF3 E (4) FF 3 SS1 FS3

23128 FSI A (3) C (5) 5 FF3 E (4) FF 3 SS1 FS3 SS3 B (4) SS3 F (5) D (3) 11.16 11,3 13 16 13.3 3 Complete the schedule network for the following fragment, then provide the duration of the project. * (5 Points) 15 16 o 18