Question: 3 . 1 4 A highway reconstruction project is being undertaken to reduce crash rates. The reconstruction involves a major realignment of the highway such

3.14 A highway reconstruction project is being
undertaken to reduce crash rates. The reconstruction
involves a major realignment of the highway such that a
60-mih design speed is attained. At one point on the
highway, a 720-ft equal-tangent crest vertical curve
exists. Measurements show that at 3+40 stations from
the PVC, the vertical curve offset is 3.5ft. Assess the
adequacy of this existing curve in light of the
reconstruction design speed of 60mih and, if the
existing curve is inadequate, compute a satisfactory
curve length.
3 . 1 4 A highway reconstruction project is being

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!