Question: 3 . 1 7 On average, 1 0 new batches of parts are started through a certain plant each week. Average batch quantity is 7

3.17 On average, 10 new batches of parts are started through a certain plant each week. Average batch quantity is 75 parts that are processed through a sequence of ten machines. Setup time per machine per batch averages 5hr, and average operation time per machine for each part is 10min. Nonoperation time per batch at each machine averages 10hr. There are 30 machines in the factory. Any machine can be set up for any type of batch processed in the plant. The plant operates 40hrwk. The plant manager complains that almost 65hr of overtime must be authorized each week to keep up with the production schedule. Determine (a) manufacturing lead time for an average order, (b) weekly production capacity of the plant if all machines were operated at 100% utilization, (c) current utilization of
87
the plant, and (d) average work-in-process (number of parts) in the plant. (e) Why must overtime be authorized to achieve the desired output?
 3.17 On average, 10 new batches of parts are started through

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock