Question: 3 . 2 How long will it take to complete 3 operations with 2 minutes downtime between operations when an operation that takes 1 0

3.2 How long will it take to complete 3 operations with 2 minutes downtime between
operations when an operation that takes 10 minutes takes up 10 minutes of the available
time of
1. a machine,
2. an operator,
3. or other resources.
- Total operation time (2)
- Total downtime (4)
- Total required time (2)
3.3 State the five factory performance measures that are about time and define them. (10)