Question: 3 - 3 4 . A building has a calculated cooling load of 2 0 tons, of which 5 tons is latent load. The space

3-34. A building has a calculated cooling load of 20 tons, of which 5 tons is latent load. The space
is to be maintained at 72 F db and 50 percent relative humidity. Ten percent by volume of the
air supplied to the space is outdoor air at 100 F db and 50 percent relative humidity. The air
supplied to the space cannot be less that 55 F db . Assume barometric pressure at sea level, and
using the program PSYCH, find (a) the minimum amount of air supplied to the space in cfm,
(b) the amounts of return air and outdoor air in cfm,(c) the conditions and volume flow rate
of the air entering the cooling coil, and (d) the capacity and SHF for the cooling coil. (Hint:
Estimate the amount of outdoor air and supply relative humidity and iterate.). Assuming the supply temperature is 55F, convert to SI UNIT and solve.
3 - 3 4 . A building has a calculated cooling

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mechanical Engineering Questions!