Question: ( 3 . 3 ) A batch production operation has a machine setup time of 3 . 0 h r and a processing time of
A batch production operation has a machine setup time of and a processing time of min per cycle. Two parts are produced each cycle. No tool handling time is included in the cycle. Part handling time each cycle is It consists of the worker obtaining two starting work units from a parts tray, loading them into the machine, and then after processing, unloading the completed units and placing them into the same tray. Each tray holds work units. When all of the starting work units have been replaced with completed units, the tray of completed parts is moved aside and a new tray of starting parts is moved into position at the machine. This irregular work element takes min. Batch quantity is units. Determine a average cycle time, b time to complete the batch, and c average production rate.
A flowline mass production operation consists of eight manual workstations. Work units
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
