Question: 3 . 5 . A construction project requires a new road to be built across a slopy area. The plan is to create an 8
A construction project requires a new road to be built across a slopy
area. The plan is to create an slope with a height of meters
through a layer of stiff clay. The local water table is estimated to be
meters below the ground surface. However, during heavy rainfall
events, it can rise by an additional meters, reaching times the
slope height behind the toe of the slope. Evaluate and conclude on
the stability of the proposed slope design. Refer to Tables and Chart
in ANNEXTURE