Question: ( 3 5 % ) During a dam construction project, the site engineer takes 9 concrete samples a day for a period of three months.

(35%) During a dam construction project, the site engineer takes 9 concrete samples a day for a
period of three months. The mean compressive strengths of these samples taken at the beginning of
the project (Day-1) in dry conditions are as given as follows (in MPa):
40.2,30.4,28.9,30.5,22.4,25.8,18.4,14.2,15.3.
(5%) a) Find the sample mean, variance, coefficients of variation, coefficients of skewness and
kurtosis for the above given sample.
(5%) b) Find a 99% lower one-sided confidence interval on true mean compressive strength.
(5%) c) Find a 98% two-sided confidence interval on true mean compressive strength.
(5%) d) Find a 99% upper one-sided confidence interval on the true variance of compressive strength.
(5%) e) Suppose that the largest observation 40.2 was misrecorded and should actually be 20.4.
Compute the sample mean, x, and the sample variance, s2. Repeat options (c) and (d) for these new
values. Compare the original computed intervals and the newly computed intervals with the corrected
observation value. Please quantify the effect of such a mistake on the values of the sample mean,
sample variance, and the width of the two-sided confidence interval.
(5%) f) Taking option (e) into account, at the end of first month (Days 1-30), it is seen that the sample
mean and variance of all the samples collected are x=22.1 and the sample variance s2=40.5,
respectively. Repeat the options (c) and (d) and compare the results.
(5%)g) The site engineer has recorded also the temperatures (at 12:00 PM everyday) at the site in the
first week of construction (given in table below). Determine the dependent (Y) and independent (x)
variables of the problem. Find the covariance and the correlation coefficient for the given data.
Determine the equation of the regression line )=(widehat()+widehat()x and find 80% confidence interval for the
slope and intercept of the regression line.
Table 1. Mean compressive strengths of concrete samples and temperatures for the first seven days.
( 3 5 % ) During a dam construction project, the

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!