Question: 3 6 4 points If set - up time is incorporated into a time study, the time allocation can be determined with standard manufacturing quantities

36
4 points
If set-up time is incorporated into a time study, the time allocation can be determined with standard manufacturing quantities or according to the job.
True
False|
 36 4 points If set-up time is incorporated into a time