Question: 3 - A proposed wind farm installation is based on the use of thirty 2 M W wind turbines. The installed capital cost is estimated
A proposed wind farm installation is based on the use of thirty wind turbines. The installed
capital cost is estimated at $ and the annual operation and maintenance costs are estimated
to be of the original capital cost. Financing for the project is to come from two sources: A
year loan at and