3- A simulation model of a G/G/1 queuing model was run for 10 min. The area under Q(t) graph is 10 units and Q(10) equals 0. The number of entities served or being served is 5. What is the average waiting time of the entities in minutes ?
a.1
b.2
c.3
d.4 e.0.5