Question: 3 ) A small town is planning to increase its water supply by constructing a well in an unconfined aquifer consisting of sand and gravel

3) A small town is planning to increase its water supply by constructing a well in an unconfined aquifer consisting of sand and gravel as shown in the figure given below. The well is designed to pump constantly at a rate of 20000 m3/day. However, well construction was halted by the Ministry of Water and Irrigation (MWI) because of concerns that pumping will significantly reduce groundwater discharge to the swamp and thus affect its habitat. The small town engineers think that the presents of the groundwater divide and the river will prevent any change in the flow to the swamp. Based on the information provided on the figure below,
Determine:
a) The location and height of the water table at the groundwater divide before
pumping.
b) The location and height of the water table at the groundwater divide after pumping and steady state is attained.
c) Would the intended well affect the groundwater discharge to the swamp.
3 ) A small town is planning to increase its

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!