Question: 3. A time study analyst wants to estimate the time required to perform a specific job. A preliminary study yielded a mean of X minutes

3. A time study analyst wants to estimate the
3. A time study analyst wants to estimate the time required to perform a specific job. A preliminary study yielded a mean of X minutes and a standard deviation of Y minutes. The desired confidence is 95 percent. How many observations will he need (including those already taken) if the expected maximum error is: A. +20 and 20 percent of the sample mean? B. One-half minute? (Use a number in the range shown instead of X and Y : Instead of X, select a number in the range of 5.05 to 5.99 Instead of Y, select a number in the range of 1.05 to 1.99)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!