Question: #3 a-c show all work please 3. (22 points) The Terminal Company is attempting to balance its assembly line of high-voltage electrical connectors. The work
#3 a-c show all work please
3. (22 points) The Terminal Company is attempting to balance its assembly line of high-voltage electrical connectors. The work elements and their precedence relationships are as follows: Immediate Predecessor(s) Work Element A B D E F G H 1 J K L Time (Min.) 5 8 12 11 5 6 4 12 14 9 8 3 A A B D D E G H F 1 KJ a. (3 points) The desired output is 24 units per day. Available production time per day is eight hours, what is the cycle time? b. (4 points) What is the theoretical minimum number of workstations? c. (15 points) Draw a precedence diagram, and balance the line (i.e., allocate the work elements to the workstations), using the longest work-element time rule. Then calculate the efficiency
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
