Question: 3 ) ( Adapted from Mott ) Part a ) Use Method III - A to compute the required size of a new, clean Schedule
Adapted from Mott Part a Use Method IIIA to compute the required size of a new, clean Schedule steel pipe that will carry mathrmftmathrms of water at circmathrmF downhill and limit the total energy loss to ft over a length of mathrmft Part b Based on your calculated diameter, specify the nominal pipe size and Part c Inner Diameter of your chosen Schedule Pipe reference Table FNote: you should have three answers for this problem!