Question: 3 - Problem Statement A motorway is going to be constructed on a 2 . 0 m high embankment. The top width of this embankment
Problem Statement
A motorway is going to be constructed on a high embankment. The top width of this embankment is going to be with a side slope of IV: It is proposed that the borrow material for this embankment be excavated from ditches on both sides of this motorway embankment. It has been found out through geotechnical investigations that the insitu material has a bulk density of The compacted density of the embankment is to be Calculate the depth of wide ditches on both sides of the embankment which would furnish the required quantity of borrow material. Assume that the moisture content of insitu material soil is the same as that required during compaction.
Objectives
Following outcomes are expected from your assigned task:
A Compute the depth of ditches.
B Required quantity of soil.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock