Question: 3 - Problem Statement A motorway is going to be constructed on a 2 . 0 m high embankment. The top width of this embankment

3- Problem Statement
A motorway is going to be constructed on a 2.0m high embankment. The top width of this embankment is going to be 30m with a side slope of IV: 2H. It is proposed that the borrow material for this embankment be excavated from ditches on both sides of this motorway embankment. It has been found out through geotechnical investigations that the in-situ material has a bulk density of 100lbft3. The compacted density of the embankment is to be 115lb.ft3. Calculate the depth of 50m wide ditches (on both sides of the embankment) which would furnish the required quantity of borrow material. Assume that the moisture content of in-situ material (soil) is the same as that required during compaction.
4- Objectives
Following outcomes are expected from your assigned task:
A- Compute the depth of ditches.
B- Required quantity of soil.
3 - Problem Statement A motorway is going to be

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!