3. Rajeshwar Engineering Works at Patna has been given a contract to make seven components by Indian Railways. Each of these components requires processing on two machines M1 and M2 in the order M1, M2. The time (in hours) required by each of these jobs for processing on the two machines is given in Table below. Find the optimal sequence for processing the seven jobs.
Job M1 M2
A 92
B 54
C 810
D 35
E 46
F 111
G 76