Question: 3. The following table provides information on a process, whose sequence of flow is AB (any available equipment can be used) CD (any available equipment

 3. The following table provides information on a process, whose sequence

3. The following table provides information on a process, whose sequence of flow is AB (any available equipment can be used) CD (any available equipment can be used): (a) Calculate the overall daily design capacity and effective capacity (i.e. with planned utilization) for the entire process. Assume 8 hours a day. (b) If we increase the design capacity of the equipment for Operation A by 15 percent, what would be the new design capacity and effective capacity of this process