Question: 3. What is/are the right elements for competitive bid? i. Bidders are often selected by the owner ii. Invitation for Bid (IFB) is issued by
3. What is/are the right elements for competitive bid?
i. Bidders are often selected by the owner
ii. Invitation for Bid (IFB) is issued by the owner
iii. The contract is typically awarded based on the lowest responsive or responsible bid
iv. Owner selects successful bidder and negotiates a final price
a.
i and ii
b.
ii and iii
c.
ii and iv
d.
i, iii and iv
4. If a Professional Engineer with Practicing Certificate offers or accepts any commission which in the opinion of Disciplinary Committee (BEM) is an illicit commission, he will be fined not exceeding
a.
RM35K
b.
RM50K
c.
RM20K
d.
RM10K
5. Under section 8 (1) & (2) of REA, which person entitled to submit plans, engineering surveys, drawings, schemes, proposals, reports, designs or studies (only he is residing in Malaysia)
a.
Graduate Engineer
b.
Professional Technician
c.
PE
d.
PEPC
6. In the Fourth Industrial Revolution (IR4.0) era, what do you think that we as a an engineer and scientist should prepare to ensure that it is benefits us a lot in our lifestyle instead of ruined it in terms of norm, ethical and health other than technology growth?