Question: 35. The article Uncertainty Estimation in Railway Track Life-Cycle Cost (J. of Rail and Rapid Transit, 2009) presented the following data on time to repair



35. The article "Uncertainty Estimation in Railway Track Life-Cycle Cost" (J. of Rail and Rapid Transit, 2009) presented the following data on time to repair (min) a rail break in the high rail on a curved track of a certain rail- way line. 159 120 480 149 270 547 340 43 228 202 240 218 A normal probability plot of the data shows a reason- ably linear pattern, so it is plausible that the populationdistribution of repair time is at least approximately nor mal. The sample mean and standard deviation are 249.? and 145.1. respectively. a. Is there compelling evidence for concluding that true average repair time exceeds 200 min? Carry out a test of hypotheses using a signicance level of .05. b. Using 0' = 150. what is the type II error probability of the test used in (a) when true average repair time is actually 300 min? That is. what is 8(300)? \f
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts