Question: 35. The article Uncertainty Estimation in Railway Track Life-Cycle Cost (J. of Rail and Rapid Transit, 2009) presented the following data on time to repair

 35. The article "Uncertainty Estimation in Railway Track Life-Cycle Cost" (J.of Rail and Rapid Transit, 2009) presented the following data on timeto repair (min) a rail break in the high rail on a

35. The article "Uncertainty Estimation in Railway Track Life-Cycle Cost" (J. of Rail and Rapid Transit, 2009) presented the following data on time to repair (min) a rail break in the high rail on a curved track of a certain rail- way line. 159 120 480 149 270 547 340 43 228 202 240 218 A normal probability plot of the data shows a reason- ably linear pattern, so it is plausible that the populationdistribution of repair time is at least approximately nor mal. The sample mean and standard deviation are 249.? and 145.1. respectively. a. Is there compelling evidence for concluding that true average repair time exceeds 200 min? Carry out a test of hypotheses using a signicance level of .05. b. Using 0' = 150. what is the type II error probability of the test used in (a) when true average repair time is actually 300 min? That is. what is 8(300)? \f

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!