Question: [ 4 0 pts ] The matrix below provides data for a local wood manufacturer that wants to decrease material handling by changing from a

[40 pts] The matrix below provides data for a local wood manufacturer that wants to decrease material handling by changing from a process layout to a GT layout. It is considering installing a conveyor for intracellular movement of parts. It wishes to restrict interacellular movement. The machine-part matrix for the wood manufacturer is shown below. Use the direct clustering algorithm to form the cells and, if conflicts exist, propose alternative approaches for resolving the conflicts.
\table[[Part No.,Punching,\table[[Man.],[Welding]],\table[[Rob.],[Welding]],Leak Test,Assembly,Paint],[1,,,,,1,1],[2,1,,,1,,],[3,,,1,,,1],[4,1,1,,,,],[5,1,,,,,],[6,,,,,1,1],[7,,1,,1,,1],[8,,,1,,,1]]The matrix below provides data for a local wood manufacturer that wants to decrease material handling by changing from a process layout to a GT layout. It is considering installing a conveyor for intracellular movement of parts. It wishes to restrict interacellular movement. The machine-part matrix for the wood manufacturer is shown below. Use the direct clustering algorithm to form the cells and, if conflicts exist, propose alternative approaches for resolving the conflicts.
 [40 pts] The matrix below provides data for a local wood

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!