Question: 4 . 2 0 You have been asked to design a flexible pavement, and the following daily traffic is expected for design: 5 0 0
You have been asked to design a flexible pavement, and the following daily traffic is expected for design: single axles at each, single axles at each, tandem axles at each, and tandem axles at each. There are three lanes in the design direction conservative design is to be used Reliability is overall standard deviation is is and the design life is years. The soil has a resilient modulus of If the TSI is what is the required SN