Question: 4 . 2 4 At a facility for train maintenance, work is done on a number of separate parallel tracks. On each of these tracks
At a facility for train maintenance, work is done on a number of separate parallel tracks.
On each of these tracks there is room for two trains on a front part and a back part. Trains
can leave the tracks only on the same side they enter the tracks. That is upon completion of
its maintenance a train may be locked in by another train that arrived later on the same track
but has not yet completed its maintenance. For each of the tracks there are two maintenance
crews, one for the train at the front part of the track and one for the train at the back. Trains
requesting maintenance arrive at the maintenance facility according to a Poisson process
with rate A train immediately receives maintenance when it finds a free place at one of
the tracks upon arrival; otherwise, the train waits until a maintenance place becomes free.
A newly arriving train is directed to a front part if both a front part and a back part are free.
The amount of time needed to serve a train has an exponential distribution with mean
It is assumed that
a Formulate a continuoustime Markov time chain for the performance evaluation of
the maintenance track.
This problem is related to the Advanced Stochastic processes, so need answer from the expert who has this advanced stochastic processes background. Thank you
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock