Question: 4 - 3 ) The contaminant concentration has been found to be 2 0 0 m for the area of a site represented in plan

4-3)
The "contaminant" concentration has been found to be 200m for the area of a site represented in plan view in the following figure. The groundwater contours are spaced at intervals of about 50 m. From test borings, the average thickness of the aquifer is 5 m and the hydraulic conductivity is estimated to be 110-2s. For each meter of length as measured parallel to the river, what is the contaminant loading rate in kg/yr?