Question: 4 4 2 P a m 3 5 0 P a m 4 - Diameter of steel pipe for section A - B: * 2

442Pam
350Pam
4- Diameter of steel pipe for section A-B:*
25mm
32mm
40mm
35mm
5- Diameter of steel pipe for section f-g**
25mm
20mm
32mm
23mm
The given figure represents a two-pipe reverse retum hot water heating system. The heating load for the system radiators is as follows. The supply hot water temperature drop is 10C and the total equivalent length of circuit (1) is 130m.*1- The total heating load for the boller Qb :
\table[[Radiator M,1,2,3,4,5,6,7,8,9],[Load (kW),3.20,2.10,2.67,3.20,2.40,2.67,2.14,4.00,2.40],[Radiator M,10,11,12,13,14,15,16,17,],[Load (kW),2.67,3.20,2.10,2.40,4.60,2.67,2.14,1.60,]]
27.36kW
50.12kW
4556kW
24.87kW
2- The required pump capacity is:"
1.1Ls
1 and 4
0.65Ls
1.1kgs
|
3- The pressure drop per unit length. If an iron and bronze pump is to be used:*
20000Pam
240Pam
 442Pam 350Pam 4- Diameter of steel pipe for section A-B:* 25mm

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mechanical Engineering Questions!