Question: 4 . 4 . Rework Problem 4 . 1 assuming that the storm occurred over a basin of 2 . 5 k m 2 ,

4.4. Rework Problem 4.1 assuming that the storm occurred over a basin of 2.5km2, the rainfall intensities were 12,10,3,8, and 5cmhr, and the direct surface runoff was 463,000m3.
4.5. Rework Problem 4.2 assuming that the initial infiltration capacity was 10cmhr, the ultimate capacity was 1.2cmhr, and a total of 33 cm of water infiltrated during the 10-hr interval.
4.6. The direct surface runoff volume from a 4.40-mi2 drainage basin is determined by planimeter from the area under the hydrograph to be 10,080cfs-hr. The hydrograph was produced by a 1.71-in.hr rain storm with a duration of 5 hr . Determine (a) the net rain and (b) the index.
4.7. The following table lists the storm rainfall data and infiltration capacity data for a 24-hr storm beginning at midnight on April 14 of the current year.
a. Plot the rainfall hyetograph and the f capacity curve on rectangular coordinate paper.
b. Determine the total storm precipitation in inches.
c. By counting squares or by planimeter, determine the net storm rain by the f capacity method.
4 . 4 . Rework Problem 4 . 1 assuming that the

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!