Question: 4 . Consider the following tasks, along with their duration and required predecessors. ( 3 0 points ) ID Description Precede ID Duration A Complete
Consider the following tasks, along with their duration and required predecessors. points
ID Description Precede ID Duration
A Complete Foundation
B Connect Plumbing A
C Install Drywall A
D Paint Interior Walls C
E Install Trim Carpentry D
F Install Windows A
G Paint Exterior Walls F
H Complete Inspection B E G
I Attain Client Approval H
J Close Sale I
a Draw the PERT flow, labeling ECT and LCT for each event. Please embed the drawing in this document, either in electronic format such as MS Visio or handdrawn sketch.
b Determine the critical path time and available slack time.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock