Question: 4. List the instruments, controllers and indicators, that should be included when checking the material balance on the absorber and stripper system. 5. Using the
4. List the instruments, controllers and indicators, that should be included when checking the material balance on the absorber and stripper system. 5. Using the appropriate indicators and controllers in the system, calculate how much catalyst (pound per hour) is being absorbed, stripped, and recycled to the reactor.