Question: 4. The task that is at the lowest level or a work breakdown structure is called: a. Work activity b. Work package c. Work milestone

4. The task that is at the lowest level or a work

4. The task that is at the lowest level or a work breakdown structure is called: a. Work activity b. Work package c. Work milestone d. Work task