Question: - 4 . ) There are four runout controls on this part. Would the inspector be required to setup the part differently for each of

-4.) There are four runout controls on this part. Would the inspector be required to setup the part differently for each of the controls? Why or why not? (6 points)
5.) As in question \#3 above, describe how you would check the two circular runouts on the front view with only manual equipment. Again, be specific. What kind of readings would expect with the dial indicator? How do you know if it is acceptable or not? (6 points)
6.) Same as question \#5 above, but this time the total runout in the front view. (6 points)
7.) We have taken readings on the four runout controls on this part. They are in the attached document titled Inspection of Runout Tolerances on Part 426.DOCX. For the two circular runout controls, figure out the FIM for each measurement and list them in another word document titled WK14-initials.DOC. In this same document you must state the pass/fail status of each runout control. (10 points)
- 4 . ) There are four runout controls on this

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mechanical Engineering Questions!