Question: * = 4.2 3. The engineers working for a local toy manufacturing company, have decided to conduct time study analysis in order to increase productivity

* = 4.2 * = 4.2 3. The engineers working for a local toy
3. The engineers working for a local toy manufacturing company, have decided to conduct time study analysis in order to increase productivity and efficiency. After several meetings with operations and product managers, one of the work stations was decided to be a pilot work station, and then the analysis on the pilot station has been performed. At the station, a job composed of three elements (A, B and C) is analyzed. Observations in minutes) are recorded as listed in the following table. The allowance time for the operation is defined as 2% for delay and 10% for fatigue. According to that, compute normal times and standard time for the job. Observations . 1 2 3 4 5 Performance Ratings (%) Job elements A B (minutes) minutes) (minutes). 4,4 3,8 3,5 3,5 5,2 4,3 0,5 5,3 9,5 95 125 85 5,8

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!