Question: 4.2 PROBLEM SET: MAXIMIZATION BY THE SIMPLEX METHOD Solve the following linear programming problems using the simplex method. 4) A factory manufactures chairs, tables and
4.2 PROBLEM SET: MAXIMIZATION BY THE SIMPLEX METHOD Solve the following linear programming problems using the simplex method. 4) A factory manufactures chairs, tables and bookcases each requiring the use of three operations: Cutting, Assembly, and Finishing. The first operation can be used at most 600 hours; the second at most 500 hours; and the third at most 300 hours. A chair requires 1 hour of cutting, 1 hour of assembly, and 1 hour of finishing; a table needs 1 hour of cutting, 2 hours of assembly, and 1 hour of finishing; and a bookcase requires 3 hours of cutting, 1 hour of assembly, and 1 hour of finishing. If the profit is $20 per unit for a chair, $30 for a table, and $25 for a bookcase, how many units of each should be manufactured to maximize profit? 5). The Acme Apple company sells its Pippin, Macintosh, and Fuji apples in mixes. Box I contains 4 apples of each kind; Box II contains 6 Pippin, 3 Macintosh, and 3 Fuji; and Box III contains no Pippin, 8 Macintosh and 4 Fuji apples. At the end of the season, the company has altogether 2800 Pippin, 2200 Macintosh, and 2300
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
