Question: noge 4.24 A 1000-tons/day ore-processing plant pro- cesses an ore that contains 20% mineral. The plant recovers 100 tons/day of the mineral. This is

noge 4.24 A 1000-tons/day ore-processing plant pro- cesses an ore that contains 20% mineral. The plant recovers 100 tons/day of the mineral. This is not a very effective operation, and some of the mineral is still in the waste ore (the tail- ings). These tailings are sent to a secondary processing plant that is able to recover 50% of the mineral in the tailings. The recovered mineral from the secondary recovery plant is sent to the main plant, where it is combined with the other recovered mineral, and then all of it is shipped to the user. douns om di to neup s a. How much mineral is shipped to the user? b. How much total tailings are to be wasted? c. How much mineral is wasted in the tailings?
Step by Step Solution
3.59 Rating (160 Votes )
There are 3 Steps involved in it
To solve the problem we follow these steps Step 1 Identify Initial Information The oreprocessing pla... View full answer
Get step-by-step solutions from verified subject matter experts