Question: 43. Which one is correct in project scheduling? A) Lead means overlap. B) Overlap means the same as lag. C) Lead means the same as



43. Which one is correct in project scheduling? A) Lead means overlap. B) Overlap means the same as lag. C) Lead means the same as lag. D) Each lead, overlap, and lag means something different. 28. Which of the following terms is used to describe a risk event that has a high impact and a high frequency? A) Severe. B) Critical. C) Serious. D) Controlled. 25. Which of the following is considered a threat transfer risk response strategy in a construction project? A) Training labourers with the latest machinery technology B) Purchasing an insurance policy for the project C) Installing security cameras at the construction site D) Avoiding hiring unprofessional labour 3. Which one is not a characteristic of a process compared to a project? A) Well-established systems B) Support the status quo C) One shot limited life D) Greater certainty 4. What is not the responsibility of a Web design project manager? A) managing resources B) Selecting a team C) Cost estimating and budgeting D) Design Website logo and template
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
