Question: 4.5. Given a process with design nominal = 5 Mils +/- 4 (or USL = 9 and LSL = 1) and Cpk = 0.85. A

4.5. Given a process with design nominal = 5 Mils +/- 4 (or USL = 9 and LSL = 1) and Cpk = 0.85. A company decided to implement a system of calling the engineer to adjust the process every time a sample (n = 4) average (xbar) was equal to = nominal + specification limits (process average = 7 or 3) What is the total probably of the engineer being called to adjust the process: _ _%, or One out of_ times If the company used a control chart for this process, X double bar average = 5; what should the limits be UCLX _LCLX _UCLE _LCLE R R Lppm 4.5. Given a process with design nominal = 5 Mils +/- 4 (or USL = 9 and LSL = 1) and Cpk = 0.85. A company decided to implement a system of calling the engineer to adjust the process every time a sample (n = 4) average (xbar) was equal to = nominal + specification limits (process average = 7 or 3) What is the total probably of the engineer being called to adjust the process: _ _%, or One out of_ times If the company used a control chart for this process, X double bar average = 5; what should the limits be UCLX _LCLX _UCLE _LCLE R R Lppm
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts