Question: 4.5. Given a process with design nominal = 5 Mils +/- 4 (or USL = 9 and LSL = 1) and Cpk = 0.85. A

 4.5. Given a process with design nominal = 5 Mils +/-

4.5. Given a process with design nominal = 5 Mils +/- 4 (or USL = 9 and LSL = 1) and Cpk = 0.85. A company decided to implement a system of calling the engineer to adjust the process every time a sample (n = 4) average (xbar) was equal to = nominal + specification limits (process average = 7 or 3) What is the total probably of the engineer being called to adjust the process: _ _%, or One out of_ times If the company used a control chart for this process, X double bar average = 5; what should the limits be UCLX _LCLX _UCLE _LCLE R R Lppm 4.5. Given a process with design nominal = 5 Mils +/- 4 (or USL = 9 and LSL = 1) and Cpk = 0.85. A company decided to implement a system of calling the engineer to adjust the process every time a sample (n = 4) average (xbar) was equal to = nominal + specification limits (process average = 7 or 3) What is the total probably of the engineer being called to adjust the process: _ _%, or One out of_ times If the company used a control chart for this process, X double bar average = 5; what should the limits be UCLX _LCLX _UCLE _LCLE R R Lppm

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!