Question: 5. A) Given the following Cash flows for Project C, calculate the Modified Internal Rate of Return (MIRR)? Assume the wacc is 12%. _________ Assume

5.

A) Given the following Cash flows for Project C, calculate the Modified Internal Rate of Return (MIRR)? Assume the wacc is 12%. _________

Assume Project C is an independent project, would you accept or reject this project?

Project A

Year Cash Flow

-12,000

+6,000

-5,000

+12,000

+9,000

+10,000