Question: 5. A work element in a manual assembly task consists of the following nine MTM-1 elements, some of them are performed while the operator is

5. A work element in a manual assembly task

5. A work element in a manual assembly task consists of the following nine MTM-1 elements, some of them are performed while the operator is sitting: (1) W5P, i.e., walk 5 paces, (2) B, i.e., bend (3) R14B, (4) G1A, (5) AB, i.e., arise from bend, (6) W1P, (7) M12B2, (8) PISSE, (9) RL1. (a) Determine the normal times in TMUs for these motion elements. (b) What is the total time for this work element in seconds? (C) Discuss and suggest the PFD allowances for this operation

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!