Question: 5. Develop an MRP spreadsheet record for six periods using the following parameters for the item: Period Gross requirements 1 20 2 20 3 40

5. Develop an MRP spreadsheet record for six

5. Develop an MRP spreadsheet record for six periods using the following parameters for the item: Period Gross requirements 1 20 2 20 3 40 4 30 5 30 6 30 Lead time Lot size Safety stock Inventory Scheduled receipt 1 period 50 units O units 2 units 50 units in period 1 a. In what periods are there planned order releases? b. What happens to the timing, number of planned order releases, and average inventory (for periods 1 through 6) if 15 units of safety stock are required? c. What happens to the timing, number of planned order releases, and average inventory (for periods 1 through 6) if a one-week safety lead time is used instead of the safety stock

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock